1题:
the salvage value of an asset is:
a. the value of the scrap metal if a new asset were taken to a scrap yard.
b. the value that an asset has on the books after one year of depreciation.
c. the costs that have been sunk into the project to date.
d. the expected cash value at the end of an assets useful life.
e. a and d only.

参考答案:D,答错率:89%
查看解析:
进入考试题库查看解析

2题:
giving a part of project work to a contractor is an example of:
a. risk mitigation
b. risk assignment
c. risk delegation
d. risk deflection
e. risk assumption

参考答案:D,答错率:91%
查看解析:
进入考试题库查看解析

3题:
项目管理计划中的以下内容会用于成本估算,除了:
A、进度管理计划
B、成本管理计划
C、人员配备管理计划
D、风险登记册

参考答案:B,答错率:92%
查看解析:
进入考试题库查看解析

4题:
组织可以用来改进沟通与团队合作的一个方法就是使用一个紧密矩阵。这个方法还可以促进: 
A.快速跟进 
B.并行管理 
C.资源平衡 
D.地理上分散的团队或虚拟团队的工作

参考答案:B,答错率:87%
查看解析:
进入考试题库查看解析

5题:
团队建设活动包括管理与采取一些特别的个人行动来提高团队的绩效。很多行动产生的附属效应也可能是团队绩效的提高。以下哪一个例子表明某些行动也能师团队绩效提高?
A. 确定团队绩效的目标,停下次要的工作以审查达到这些目标的最佳方法
B. 将所有的团队成员集中到一个地点办公
C. 建立一个基于团队的奖励与表彰系统
D. 让非管理层的团队成员参与到计划编制过程中来

参考答案:D,答错率:65%
查看解析:
进入考试题库查看解析

6题:
the scope baseline once established and approved, is used:
a. as the basis for making future decisions.
b. to accomplish verification measures.
c. to evaluate potential changes.
d. all of the above.
e. a and c only.

参考答案:D,答错率:66%
查看解析:
进入考试题库查看解析

7题:
a task-oriented family tree of activities is a:
a. detailed plan.
b. linear responsibility chart.
c. work breakdown structure.
d. cost account coding system.
e. work package description.

参考答案:C,答错率:49%
查看解析:
进入考试题库查看解析

8题:
The use of the project reports:
A are not necessary on small projects
B provides a means whereby various levels of authority can judge project performance
C provides insight into project areas and the effectiveness of the control systems
D All of the above
E B and C

参考答案:E,答错率:30%
查看解析:
进入考试题库查看解析

9题:
如果(BCWP)已完成工作预算费用=350,(ACWP)已完成工作实际费用=400 和(BCWS)计划工作预算费用=325,(SPI)进度业绩指标为何?
A.0.813
B.0.875
C.1.077
D.1.143

参考答案:C,答错率:95%
查看解析:
进入考试题库查看解析

10题:
推荐的预防措施是:
A、监控项目工作过程的输入
B、监控项目工作过程的输出
C、整体变更控制的输出
D、指导与管理项目执行的输出

参考答案:B,答错率:67%
查看解析:
进入考试题库查看解析