Creation of project objectives: 
A allows for data collection and analysis and progress reporting against which standards of 
performance can be measured. 
B is accomplished by selection of measurable variables against which performance can be
judged. 
C is required before funding of the project by the project sponsor. 
D all of the above. 
E A and B only 

试题出处:http://www.examtiku.com/shiti/8779920396.html
网考网参考答案:E
网考网解析:
进入考试题库查看解析
大数据分析:根据网考网与考试题库的统计分析,该试题:
16%的考友选择了A选项
69%的考友选择了B选项
14%的考友选择了C选项
0%的考友选择了D选项
1%的考友选择了E选项