PMP考试易错题(2017/10/18) |
第1题:the budget associated with scope changes that have been approved but not planned for yet, is referred to a(n) _____ budget. a. unauditable. b. undistributed. c. preauthorized. d. contingency. e. in-process. |
【单选题】: |
第2题:The erection of foundation formwork before the placement of foundation concrete would be an example of a _____ dependency. A Discretionary B Mandatory C External D Soft logic E Subcontracted |
【单选题】: |
第3题:以下观点说法正确的是() A.国家规划是制定和运用财政政策和货币政策的基本依据 B.财政政策具有总体指导、综合协调的功能 C.财政、货币具有独自的功能和运行机理 D.国家规划涵盖财政政策和货币政策 E.国家规划是国家对经济和社会发展的总体谋划,是国家长远发展的纲领性计划。 |
【多选题】: |
第4题:无法直接记入某个项目的成本,就只有用某种方法分摊到相关项目中。这种成本是()。 A.固定成本 B可变成本 C直接成本 D间接成本 |
【单选题】: |
第5题:when working in an environment that uses learning curves, the most effective plan for creating the perception that pay is related to performance is to provide the team members with an individual salary plus bonus based upon a. individual productivity b. cost effectiveness c. group or team productivity d. rating system developed by the project manager e. all of the above |