PMP考试易错题(2018/12/4) |
第1题:风险后果是指什么? |
【分析题】: |
第2题: Feasibility studies occur in which life cycle phase (s)? A Conceptual B Conceptual or Development C Execution D Preliminary planning E any life cycle phase |
【单选题】: |
第3题: Quality and grade are not the same. A fundamental distinction is that ______ . A.grade is a category assigned to products or services having the same functional us but different technical characteristics B.low quality may not be a problem; low grade is always a problem C.determining and delivering the required levels of quality are not included in the responsibilities of the project manager and the project team D.determining and delivering the required levels of grade are not included in the responsibilities of die project manager and the project team |
【单选题】: |
第4题:可能需要重新制定基准计划来: A.表明项目进度没有落后 B.提供实际数据评估绩效 C.报告进度更新 D.表示采取纠错行动的特殊形式 |
【单选题】: |
第5题:尽管当你收集项目需求时有各种不同的工具与技术可供参考,但支持渐进明 细的方法是____。 a.概念/思维导图 b.亲和图 c.原型法 d.联合应用设计8会议 |
【单选题】: |