PMP考试易错题(2019/2/20) |
第1题:a plan has budgeted three weeks of effort for consultants, but the job was done in only two weeks. calculate the variance: a. 0.015 b. 0.33 c. 0.75 d. 0.67 e. none of the above |
【单选题】: |
第2题:项目质量管理的原则有哪些? |
【分析题】: |
第3题:以下哪个不是项目信息管理的内容? A.信息革命 B.信息收集 C.信息分析 D.信息储存 |
【单选题】: |
第4题:对需求很不易确定的项目,最不能采用以下哪种阶段与阶段之间的关系 ( )
|
【单选题】: |
第5题: While doing quality inspection,few defects were identified in the product.After rectifying the defects,the repaired items were reinspected and accepted.Subsequently,a notification was issued,which can also be referred to as______. A.validated defect repair B.product acceptance C.quality audit D.approved change request |
【单选题】: |