PMP考试易错题(2019/3/8) |
第1题:You have taken information on project scope and resources and then developed durations for input to schedules. Since there was very limited information about the project, you used actual duration of a previous, similar activity as the basis for estimating future activity. What will be a next step after this activity A、Using diagramming techniques like GERT and systems dynamic B.Calculating theoretical early and late start and finish dates for all project activitie C、Using standardized networks to expedite preparation of project network diagram D.Subdividing project work packages into smaller more manageable components for better management contro |
【单选题】: |
第2题:下列叙述中,有误的一项是()。 A、资本市场与金融市场是从属关系 B、资本市场与劳动力市场、技术市场、土地市场等同属于生产要素市场 C、货币市场先于资本市场出现 D、货币市场是资本市场的基础 |
【单选题】: |
第3题:产生“挤出效应”的大小和()有关 A.经济中资源是否得到充分利用 B.货币供给是否相应增加 C.社会经济活动是否达到充分就业水平 |
【多选题】: |
第4题:A network has been developed with resources from six different departments. One of the six departments has just informed you that they can increase the number of employees from 5 to 8. This will result in: A A shortening of the critical path. B A shortening of the noncritical path. C A decrease in the total cost of the project. D An increase in the cost of the project. E A through D are possible based upon where the resources are deployed |
【单选题】: |
第5题:项目的阶段性成果我们称为: a.里程碑 b.可交付成果 c.项目产品 d.项目结论 |
【单选题】: |