试题查看

首页 > PMP考试 > 试题查看
【单选题】

 Value engineering/Analysis is the systematic use of techniques which does not include _____. 

A establishing values for required functions 
B provide the required functions at the lowest overall cost. 
C identifies the required function of an item 
D seeks to trade performance for cost 
E None of the above. 
查看答案解析

参考答案:

正在加载...

答案解析

正在加载...

根据网考网移动考试中心的统计,该试题:

85%的考友答对了

你可能感兴趣的试题

ThecomputationforCostPerformanceIndexis:Whencomparingthecostofcompetingprojects,TheCostPerformanceIndex(CPI)measures:AcoParametricestimatesarebasedonvariablessuCostandscheduledataareusuallyintegratedbContinuallymeasuringandmonitoringtheactu