试题查看

首页 > 托业考试 > 试题查看
【单选题】

BriDgE rEpAir workDElAyED
thE ministEr For inFrAstruCturE,BArry smEltz, AnnounCED toDAy thAt work on thE norwEllBriDgE will not stArt until mArCh 18. thE rEpAir work wAs originAlly sChEDulED ForDECEmBEr. howEvEr, thE ministEr sAiD thAt thE ConstruCtion ContrACtor ADvisED him thAt sEvErE wintEr wEAthEr woulD mAkE thE work ExtrEmEly DiFFiCult. instEAD, thE ContrACtor suggEstED thAt it woulD BE BEttEr to wAit For iCy AnD snowy ConDitions oF miD-wintEr to pAss BEForE BEginning thE work. onCE CommEnCED, thE rEpAir work is ExpECtED to tAkE ArounD 6 wEEks.
For rEsiDEnts oF thE norwEll rEgion, thE DElAy mEAns thAt thEy will nEED to kEEp using thE BACk roADs rAthEr thAn going ACross thE BriDgE. thE ministEr promisED thAt ADDitionAl EFForts will BE mADE to ClEAr thEsE BACk roADs oF snow AnD iCE During wintEr so thAt rEsiDEnts CAn ContinuE to trAvEl in AnD out oF thE rEgion sAFEly AnD EAsily.
whAt is not mEntionED in thE ArtiClEA.thE ConstruCtion ContrACtor’s ADviCE hAs BEEn ACCEptED、
B.thE work shoulD tAkE 6 wEEks to ComplEtE.
C.rEsiDEnts CurrEntly hAvE to tAkE AltErnAtivE routEs.
D.wintEr ConDitions will prEvEnt trAvEl Along BACk roADs.

查看答案解析

参考答案:

正在加载...

答案解析

正在加载...

根据网考网移动考试中心的统计,该试题:

15%的考友选择了A选项

2%的考友选择了B选项

1%的考友选择了C选项

82%的考友选择了D选项

你可能感兴趣的试题