【单选题】

The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable ______ of the technical requirements for the software product.

During the requirements definition phase, the requirements definition team uses an iterative process to expand abroad statement of the system requirements into a complete and detailed specification of each function that the software must perform and each ______ that it must meet.The starting point is usually a set of high-level requirements from the ______ that describe the project or problem.
In either case, the requirements definition team formulates an overall concept for the system and the defines ______ showing how the system will be operated, publishes the system and operation concept documents, and conducts a system concept review(SCR).
Following the SCR, the team derives ______ requirements for the system from the high-level requirements and the system operations concept.Using structured or object-oriented analysis, the team specifies the software functions and algorithms needed to satisfy each detailed requirements.
A.function
B、definition C.specificationD.statement
查看答案解析

参考答案:

正在加载...

答案解析

正在加载...

根据网考网移动考试中心的统计,该试题:

3%的考友选择了A选项

11%的考友选择了B选项

83%的考友选择了C选项

3%的考友选择了D选项