【单选题】

Using the WBS shown in the Special window, a typical work package would be: 

A Software development 
B Systems design 
C Coding 
D A, B, and C 
E None of the above.
查看答案解析

参考答案:

正在加载...

答案解析

正在加载...

根据网考网移动考试中心的统计,该试题:

0%的考友选择了A选项

0%的考友选择了B选项

0%的考友选择了C选项

0%的考友选择了D选项