【单选题】

An EArly vErsion oF onE oF w.EDwArDDEming’s 14 points EnCourAgED CompAniEs to “CEAsE DEpEnDEnCE on mAss inspECtion By BuilDing quAlity into thE proDuCt in thE First plACE”.DEming stAtED thAt, typiCAlly, proDuCts ArE inspECtED As thEy ComE oFF thE linE or At mAjor stAgEs.DEFECtivE proDuCts ArE EithEr thrown out or rEworkED、Both options ArE ExpEnsivE. this ApproACh, in EFFECt, mEAnt thAt CompAniEs woulD pAy workErs to mAkE DEFECts AnD thEn CorrECt thEm.DEnting lAtEr rECognizED thE vAluE oF inspECtions AnD rEvisED thE point to sAy thAt pEoplE shoulD “unDErstAnD thE purposE oF inspECtion. ” hE sAiD, “inspECtions must BE CArriED out in A proFEssionAl wAy, not By liCk-spit mEthoDs. ” this supports thE pmBok, whiCh inDiCAtEs thAt inspECtions CAn BE usED to DEtErminE whEthEr rEsults ConForm to rEquirEmEnts. inspECtions Also mAy BE CAllED ______ .
A、Control tEsts
B、wAlk-through
C.stAtistiCAl sAmpling
D.ChECklists

查看答案解析

参考答案:

正在加载...

答案解析

正在加载...

根据网考网移动考试中心的统计,该试题:

6%的考友选择了A选项

87%的考友选择了B选项

0%的考友选择了C选项

7%的考友选择了D选项

你可能感兴趣的试题

项目经理更应该是一个通才,而不是一个专才。为了管理好项目,项目经理需要具备多方面采购绩效审查包括下列各项,除了()。A.对采购过程有效性的审查B.对卖方合同执行以下哪个是风险转移的例子()A.从项目中取消一项风险高的工作B.选用比较稳定的供用语言或行为恐吓、羞辱他人,违反了以下哪个价值观()A.责任B.公正C.尊重D.过程改进计划是项目管理计划的子计划,其中应包括()。A.过程责任人、过程配置、过某项目主要依靠外部组织的力量来完成,其中一个合同的期限预计为3年,价格可能高达5