根据网考网考试中心的统计分析,以下试题在2018/10/2日托业考试习题练习中,答错率较高,为:45%
【单选题】The cost ______ provided by the building contractor for the renovation work was much higher than we anticipated.
- (A) proportion
- (B) estimate
- (C) deduction
- (D) measurement
根据网考网考试中心的统计分析,以下试题在2018/10/2日托业考试习题练习中,答错率较高,为:45%
【单选题】The cost ______ provided by the building contractor for the renovation work was much higher than we anticipated.
发布评论 查看全部评论